Below are Farmington's typical floor-job bands and the four things that move a quote: pan condition (the big one), drain changes, tile format, and access. Every Farmington Valley Shower Co. quote follows a free moisture assessment, so the pan question is answered with readings — not discovered mid-job as a change order.

JobTypical range
Floor re-tile, sound pan$1,000–$2,000
Floor + pan rebuild$1,500–$2,800
Drain upgrade$200–$600
Linear drain / curbless$2,500–$4,500
Re-seal / re-joint repair$200–$500
Leak diagnosisFree with job

What moves the price

  • Floor re-tile, sound pan ($1,000–$2,000) — tile out, waterproof, re-tile, epoxy grout.
  • Floor + pan rebuild ($1,500–$2,800) — new sloped mud bed or foam tray + membrane.
  • Drain upgrade ($200–$600) — new clamping drain or tile-in grate with any floor job.
  • Linear drain / curbless ($2,500–$4,500) — single-slope floor, modern drain, glass-ready.
  • Leak diagnosis (free with job) — moisture mapping included in every assessment.

In Farmington

In Farmington the pan is the price question: The Farmington pattern: a 1980s fiberglass shower pan gone dull and flexy next to dated brass trim. Shower-floor and pan re-tiles outnumber full redos here, and buyers notice new shower floors first. We answer it free at assessment with meter readings and a flood-test recommendation when warranted — then the quote is fixed.

FAQ

Farmington pricing questions

Q01
What if the pan fails mid-job?

It can't surprise us — flood testing happens before tile, and the contract prices both paths (sound-pan and rebuild) upfront. You approve before we proceed.

Q02
Does tile choice change the price much?

Less than you'd think: floors are ~10 square feet, so even premium mosaic adds only $100–$300 in material. Substrate condition moves quotes far more.

Q03
Re-seal vs. rebuild — how do I choose?

Free diagnosis decides. Failed joints on a sound base = re-seal/re-joint ($200–$500). Failed base = rebuild. The meter and flood test pick, not the pitch.

Q04
Deposit and payment?

Small scheduling deposit, balance at walkthrough approval after flow test. Plain-language terms on the quote.

Q05
Do you warranty against future leaks?

Workmanship terms are stated on every quote and cover our assembly — base, membrane, joints, seals. Tests are documented and yours to keep.